Ukraine SPP Ukraine Tv Tower SPP Turkmenistan
- SPP
- Charging station
- Storage
- Biomass
- Investment
- Dot size is proportional to installed capacity
- Karaman WPP with Storage WPP with storage · In progress Services: Project development 2026 220 MW
- Kazımkarabekir SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 24.8 MW
- Polatlı SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 16.3 MW
- Gülnar SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 12.1 MW
- Gönen SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 11.8 MW
- Yerköy SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 9.3 MW
- İpekyolu SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 8.7 MW
- Ulubey SPP SPP · In progress Services: Operation & maintenance, Monitoring 2026 7.7 MW
- Siverek Bucaklar SPP SPP · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 4.5 MW
- Tunapark Residences Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 366 kW
- Bursa Özdilek AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 300 kW
- Kocaeli Özdilek AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 300 kW
- Sakarya Erenler Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 300 kW
- Anatolia City Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 264 kW
- Medeniyet University Tuzla Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 252 kW
- Keşan Sümer Akaryakıt Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 180 kW
- Dağ Prime Residences Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 176 kW
- Avrupark Block 650 Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 110 kW
- Yeni Mücevherkent Residences Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 110 kW
- Leda Nexa Residences Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 99 kW
- Beyaz Konaklar Residences Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 88 kW
- İbn Haldun University Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2026 80 kW
- Bozkurt Garaj Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2026 44 kW
- Mucur SPP SPP · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2025 8.2 MW
- SM SPP SPP · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2025 2.7 MW
- KİPTAŞ Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 880 kW
- Medeniyet University North Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 220 kW
- Concord İstanbul Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 198 kW
- Saray Royll Mobilya Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 164 kW
- Yeğin Petrol Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 164 kW
- Medeniyet University South Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 88 kW
- Maviçam Apt. Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 44 kW
- Çiçek Apt. Charging station · In progress Services: Installation, Operation & maintenance, Monitoring 2025 44 kW
- GEPAT Energy Storage Plant Storage · In progressInvestment Services: Project development 2024 40 MW
- Ukraine SPP SPP · In progressInvestment Services: Project development, Engineering 2024 12 MW
- Biyocycle BPP Biomass + SPP · In progressInvestment Services: Project development 2024 11 MW
- CETA BPP Biomass + SPP · In progressInvestment Services: Project development 2024 11 MW
- Nevşehir SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation 2024 6 MW
- Povrika E-E2, Povrika F-F2, Povrika G-H SPP · Completed Services: Not specified 2024 3.8 MW
- Denizli SPP SPP · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2024 2.5 MW
- Ortaköy SPP Facility type not specified · Completed Services: Not specified 2024 2.1 MW
- Karapınar SPP SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 11.2 MW
- WM Yunak SPP SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 9 MW
- WM Karaman SPP 2 SPP · Completed Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 3.9 MW
- Adıyaman Merkez SPP 1 SPP · Completed Services: Operation & maintenance, Monitoring 2023 3.8 MW
- Kızılkuyu SPP SPP · In progress Services: Operation & maintenance, Monitoring 2023 3.6 MW
- Bitlis Merkez SPP SPP · In progressInvestment Services: Operation & maintenance, Monitoring 2023 3.3 MW
- Afyon Özdilek AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 2.5 MW
- Highway South Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 1.2 MW
- Adıyaman Merkez SPP 2 SPP · Completed Services: Operation & maintenance, Monitoring 2023 1.2 MW
- Ayrancı SPP SPP · Completed Services: Not specified 2023 1.1 MW
- Gloria Avlu Çeşme Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 400 kW
- Başakşehir Phase 4, Zone 2-1 Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Başakşehir Phase 4, Zone 2-3 Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Başakşehir Phase 4, Zone 2-4 Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Ihlamur Residences-1 Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Ihlamur Residences-2 Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Sapphire AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 60 kW
- Wyndham Grand Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 44 kW
- Rakish Alaçatı Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 22 kW
- Surga Alaçatı Charging station · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2023 11 kW
- Kadınhanı SPP SPP · Completed Services: Operation & maintenance, Monitoring 2022 9.4 MW
- WM Ereğli SPP SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 7.2 MW
- Çınar SPP SPP · TransferredInvestment Services: Engineering, Procurement, Operation & maintenance, Monitoring 2022 5.7 MW
- WM Karaman SPP 1 SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 5.3 MW
- Akçadağ SPP SPP · In progressInvestment Services: Operation & maintenance, Monitoring 2022 3.3 MW
- Tepebaşı SPP SPP · In progressInvestment Services: Engineering, Procurement, Operation & maintenance, Monitoring 2022 3.3 MW
- WM Kozaklı SPP SPP · Completed Services: Operation & maintenance, Monitoring 2022 2.9 MW
- Acarlar Çöpşiş Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Askoҫ Park Rest Area North Charging station · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Selway AVM West Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Selway AVM East Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Susurluk Festiva AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Tuğra Rest Area Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Uçakpark Charging station · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Çıkla Petrol Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 2.5 MW
- Siverek SPP SPP · Completed Services: Operation & maintenance, Monitoring 2022 2.2 MW
- Baykan SPP SPP · Completed Services: Not specified 2022 1.4 MW
- Askoҫ Park Rest Area South Charging station · CompletedInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 1.2 MW
- Aktaş SPP 2 SPP · SoldInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 1.2 MW
- Silvan SPP SPP · TransferredInvestment Services: Engineering, Procurement, Operation & maintenance, Monitoring 2022 1.1 MW
- BKY 2 SPP SPP · In progress Services: Operation & maintenance, Monitoring 2022 1 MW
- Karadeniz Erpet Petrol Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 1 MW
- Taşucu Park Petrol Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 1 MW
- Yandım Çavuş Rest Area Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 1 MW
- Efeler Tarım SPP · In progress Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 898 kW
- Yeşilova SPP 3 SPP · In progress Services: Operation & maintenance, Monitoring 2022 650 kW
- Alanya Bus Terminal Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 630 kW
- ERC Petrol Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 400 kW
- Kırlangıç AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 390 kW
- Akbatı AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 300 kW
- Antalya Özdilek AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 300 kW
- Kaş Bus Terminal Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 300 kW
- İstanbul Özdilek AVM Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 300 kW
- Çeşme İnkim Suites Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2022 33 kW
- Yahyalı SPP SPP · Completed Services: Project development, Operation & maintenance, Monitoring 2021 8.8 MW
- Ağrı Merkez SPP 1 SPP · Completed Services: Project development, Operation & maintenance, Monitoring 2021 7 MW
- Netbor SPP SPP · Completed Services: Procurement, Operation & maintenance, Monitoring 2021 6.8 MW
- Ağrı Merkez SPP 2 SPP · Completed Services: Project development, Operation & maintenance, Monitoring 2021 6 MW
- Seferihisar SPP 2 SPP · Completed Services: Engineering, Procurement, Installation 2021 6 MW
- Bornova SPP SPP · In progress Services: Operation & maintenance, Monitoring 2021 2.8 MW
- Köprübaşı SPP SPP · In progress Services: Operation & maintenance, Monitoring 2021 2.4 MW
- Seferihisar SPP 1 SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2021 2.4 MW
- Salihli SPP SPP · In progress Services: Operation & maintenance, Monitoring 2021 2.1 MW
- Yılmaz SPP SPP · Completed Services: Procurement, Operation & maintenance, Monitoring 2021 1.4 MW
- Çetince SPP SPP · Completed Services: Operation & maintenance, Monitoring 2021 1.2 MW
- Ulukışla SPP SPP · Completed Services: Not specified 2021 1.2 MW
- Karaburun SPP SPP · In progress Services: Operation & maintenance, Monitoring 2021 960 kW
- Konakoğlu SPP SPP · In progress Services: Operation & maintenance, Monitoring 2021 648 kW
- Sancaktepe Rooftop SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2021 378 kW
- Wow Hotel Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2021 300 kW
- DBE Holding Charging station · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2021 88 kW
- Tavas SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 7.1 MW
- Kaman SPP 2 SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 4.9 MW
- Kulu SPP 2 SPP · In progress Services: Operation & maintenance, Monitoring 2020 4.8 MW
- Yeşilova SPP 2 SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 4.4 MW
- Saraypınar SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 3.7 MW
- Cihanbeyli SPP 1 SPP · In progress Services: Operation & maintenance, Monitoring 2020 3.3 MW
- Kulu SPP 1 SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 2.2 MW
- Yukarı Mahalle SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 1.8 MW
- Kaman SPP 1 SPP · In progressInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 1.2 MW
- Yeşilova SPP 1 SPP · TransferredInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 1.2 MW
- Cihanbeyli SPP 2 SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2020 1.2 MW
- Pazaryeri SPP SPP · Completed Services: Project development, Operation & maintenance, Monitoring 2019 10.1 MW
- Hasaköy SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2019 4.8 MW
- Aktaş SPP SPP · In progress Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2019 3.7 MW
- Tatvan SPP SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2018 6.1 MW
- Düzdağ SPP SPP · Completed Services: Installation 2016 11 MW
- Köprülü SPP - 1 SPP · Completed Services: Installation 2016 8 MW
- Bademağacı SPP SPP · Completed Services: Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2016 6.6 MW
- Kozaklı SPP SPP · SoldInvestment Services: Project development, Engineering 2016 5.6 MW
- Yalvaç SPP 2 SPP · SoldInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2016 5.4 MW
- Altıeylül SPP SPP · Completed Services: Engineering 2016 4.4 MW
- Emirdağ SPP SPP · Completed Services: Installation 2016 3.5 MW
- Gölbaşı SPP SPP · Completed Services: Installation 2016 2.6 MW
- Dağbeli SPP 1 SPP · Completed Services: Engineering 2016 2.2 MW
- Sırçalı SPP SPP · SoldInvestment Services: Project development, Engineering 2016 2.2 MW
- İmamdamı SPP SPP · Completed Services: Engineering, Procurement, Installation 2016 2.1 MW
- Yalvaç SPP 1 SPP · SoldInvestment Services: Project development, Engineering, Procurement, Installation, Operation & maintenance, Monitoring 2016 1.8 MW
- Dağbeli SPP 2 SPP · Completed Services: Engineering 2016 1.1 MW
- Darende SPP SPP · Completed Services: Engineering, Installation 2016 1.1 MW
- Serik SPP SPP · Completed Services: Engineering 2016 220 kW
- Dombaylı SPP SPP · Completed Services: Engineering 2015 17.6 MW
- Toprakkale SPP SPP · Completed Services: Installation 2015 7.7 MW
- Boğazlıyan SPP SPP · Completed Services: Installation 2015 5.4 MW
- Bektaşlı SPP SPP · SoldInvestment Services: Project development, Engineering 2015 5.3 MW
- Çal SPP 2 SPP · Completed Services: Installation 2015 5.1 MW
- Kulu Selçuklu SPP SPP · Completed Services: Installation 2015 4.4 MW
- Merkez Gölcük SPP SPP · Completed Services: Project development, Engineering 2015 4.4 MW
- Güvercinlik SPP SPP · SoldInvestment Services: Project development, Engineering 2015 4.4 MW
- Çal SPP 1 SPP · Completed Services: Installation 2015 4.4 MW
- Göktekin SPP 1 SPP · Completed Services: Installation 2015 4.2 MW
- Yassıcabel SPP SPP · SoldInvestment Services: Project development, Engineering 2015 4 MW
- Emirdağ SPP 1 SPP · Completed Services: Installation 2015 3.4 MW
- Yarbaşı SPP SPP · SoldInvestment Services: Project development, Engineering 2015 3 MW
- Karlık SPP SPP · Completed Services: Engineering 2015 2.3 MW
- Ağzıkarahan SPP SPP · Completed Services: Engineering 2015 2.3 MW
- Aladdin SPP SPP · SoldInvestment Services: Project development, Engineering 2015 2.2 MW
- Çardak SPP SPP · SoldInvestment Services: Project development, Engineering 2015 1.9 MW
- Nemli SPP SPP · Completed Services: Installation 2015 1.1 MW
- Altıeylül Pamukçu SPP SPP · Completed Services: Engineering 2015 1.1 MW
- Arifiye SPP SPP · Completed Services: Engineering 2015 778 kW
- Van Airport SPP (DHMİ) SPP · Completed Services: Engineering 2015 550 kW
- Göktekin SPP 2 SPP · Completed Services: Installation 2015 533 kW
- Bolvadin Rooftop SPP SPP · Completed Services: Engineering, Procurement, Installation 2015 300 kW
- Tes Enerji SPP · Completed Services: Engineering 2014 18.7 MW
- Kinesis Enerji SPP · Completed Services: Engineering, Installation 2014 10 MW
- Yazıbelen SPP SPP · Completed Services: Engineering, Procurement, Installation 2014 7.7 MW
- Çukurova SPP 2 SPP · SoldInvestment Services: Project development, Engineering 2014 6.5 MW
- İhsaniye SPP SPP · Completed Services: Engineering 2014 6 MW
- Seyitgazi SPP 2 SPP · Completed Services: Engineering, Procurement, Installation 2014 5.9 MW
- Karaalan SPP SPP · Completed Services: Engineering 2014 5.5 MW
- Solaklı SPP SPP · Completed Services: Engineering 2014 5.5 MW
- Seyitgazi SPP 1 SPP · Completed Services: Engineering, Procurement, Installation 2014 5.4 MW
- Çifteler SPP 1 SPP · Completed Services: Engineering 2014 5.4 MW
- Esenyazı SPP SPP · Completed Services: Engineering, Procurement, Installation 2014 5 MW
- Doğalar SPP 1 SPP · Completed Services: Engineering 2014 4.9 MW
- Yeşilyurt SPP 1 SPP · Completed Services: Engineering 2014 4.4 MW
- Çifteler SPP 3 SPP · Completed Services: Engineering 2014 4.4 MW
- Çukurova SPP 1 SPP · SoldInvestment Services: Project development, Engineering 2014 4.4 MW
- Ceyhan SPP SPP · Completed Services: Engineering 2014 3.3 MW
- Çifterler SPP 2 SPP · Completed Services: Engineering 2014 3.3 MW
- Araban SPP SPP · SoldInvestment Services: Project development 2014 2.6 MW
- Elbistan SPP 1 SPP · SoldInvestment Services: Project development, Engineering 2014 2.2 MW
- Yeşilyurt SPP 2 SPP · Completed Services: Engineering 2014 2.2 MW
- Doğalar SPP 2 SPP · Completed Services: Engineering 2014 2.2 MW
- Çifterler SPP 4 SPP · Completed Services: Engineering 2014 2.2 MW
- Çukurova SPP 3 SPP · SoldInvestment Services: Project development, Engineering 2014 1.6 MW
- Yeniyapan SPP SPP · SoldInvestment Services: Project development, Engineering 2014 1.5 MW
- Başaran SPP 1 SPP · Completed Services: Project development, Engineering 2014 1.1 MW
- Ilgın SPP Facility type not specified · Completed Services: Not specified 2014 1.1 MW
- Başaran SPP 2 SPP · Completed Services: Project development, Engineering 2014 880 kW
- Gaziantep Airport (DHMİ) SPP · Completed Services: Project development 2014 550 kW
- Rameks SPP 2 Storage + SPP · Completed Services: Project development, Engineering, Procurement, Installation 2014 300 kW
- Elbistan SPP 3 SPP · Completed Services: Project development, Engineering 2013 7.7 MW
- Kahta SPP SPP · Completed Services: Project development, Engineering 2013 4.4 MW
- Elbistan SPP 2 SPP · Completed Services: Project development, Engineering 2013 3.3 MW
- Güneşli Günler SPP SPP · Completed Services: Engineering 2013 2.3 MW
- Altınekin SPP 1 - 2 SPP · Completed Services: Engineering 2013 2.2 MW
- Rameks SPP SPP · Completed Services: Engineering, Procurement, Installation 2013 429 kW
- Selçuk SPP SPP · Completed Services: Engineering, Procurement, Installation 2013 231 kW
- Tv Tower SPP Storage + SPP · Completed Services: Project development, Engineering, Procurement, Installation 2013 80 kW
- Ege Orman Vakfı SPP · Completed Services: Project development, Engineering 2012 500 kW
- Torbalı Rooftop SPP SPP · Completed Services: Engineering 2012 400 kW
- Pamukçu SPP SPP · Completed Services: Engineering, Procurement, Installation 2012 136 kW
- Gürsu Municipality SPP 1 SPP · Completed Services: Project development, Engineering, Procurement, Installation, Monitoring 2012 96 kW
- Gürsu Municipality SPP 3 SPP · Completed Services: Project development, Engineering, Procurement, Installation, Monitoring 2012 7.2 kW
- Gürsu Municipality SPP 2 Storage + SPP · Completed Services: Project development, Engineering, Procurement, Installation 2012 3 kW