We completed the installation of a fast charging station at Özdilekpark Kocaeli Mall

At DBE Energy, we have completed the installation and commissioning of a Siemens SICHARGE D DC fast charging station with 300 kW output power for the GIO EV charging network at Özdilekpark Kocaeli AVM in Kartepe, Kocaeli. The process that began with installation was completed with the station's connection to our central monitoring system and its first charging session; the station is now in service for EV drivers.
Shopping malls are among the places where charging can become a natural part of daily life for EV owners. When drivers plug in their vehicles and then finish their shopping, a meal or an appointment, charging stops being a separate wait and becomes part of the visit. The new station at Özdilekpark Kocaeli AVM is positioned as a service point that responds to this habit.
Station features

The station has 2 tethered CCS2 charge points. CCS2 (Combined Charging System Type 2) is the connector standard widely used for DC fast charging in Europe and Türkiye. The standard adds extra DC pins below the Type 2 inlet used for alternating current charging, combining slow and fast charging in a single charging inlet on the vehicle. As a result, the vast majority of electric cars in Türkiye can charge at the station without an additional adapter.
The tethered design eliminates the need for drivers to carry a separate charging cable. Because DC fast charging involves high currents, cables permanently attached to the station are standard practice in the industry; these cables are designed to operate safely under high power. All the driver needs to do is plug the connector into the vehicle and start the charging session.
The 300 kW output power of the Siemens SICHARGE D places the station in the high-power class. This power level allows vehicles that can accept high charging power to substantially charge their batteries during a short stop. Combined with the time spent at the shopping mall, this capacity makes it easier for drivers to leave the mall with enough range in their vehicles.
Charging that matches your shopping time
Charging with alternating current at home or at work can take hours. In DC fast charging, energy is converted into direct current by the power electronics inside the station and delivered directly to the vehicle's battery, significantly reducing charging time. This difference takes on particular meaning at places such as shopping malls, where visitors spend a certain amount of time; while drivers spend time at the mall, their batteries keep charging.
This model reduces the need to set aside separate time for charging. A quick weekday evening shopping trip or a weekend day out with the family coincides with the time needed to get the vehicle ready for its next journeys. For drivers who live in apartment buildings without home charging, a fast charge point at a shopping mall they visit regularly is an option that makes using an EV easier in daily life.
From the shopping mall's perspective, the charging station stands out as a service offered to visitors who drive EVs. Having an accessible fast charge point at the mall is among the conveniences that can influence EV owners' choice of where to go. Charging infrastructure thus becomes something that adds value for both the driver and the venue.
This approach is also an example of charging infrastructure becoming integrated into urban life. Being able to charge at a place they are already going, instead of looking for a separate stop, moves EV use away from the habit of refueling toward a different routine: the vehicle charges while the driver is busy with something else.
A new charge point for Kocaeli and Kartepe
Kocaeli is a province on the highway link between İstanbul and Anatolia, notable for its industry and population. This location makes charging infrastructure important not only for local use but also for drivers passing through the region. Kartepe, meanwhile, is a district that draws visitors with its natural areas, which means charge points in the area may be needed not only by local drivers but also by those visiting the district.
The value of a charging network to drivers is measured by having stations where they are needed and by their reliable operation. An EV driver planning a journey wants to know in advance whether fast charging is available at the places they will travel to or stop at. The station at Özdilekpark Kocaeli AVM adds a new point to the GIO EV charging network in Kocaeli that meets this need.
Having a high-power charge point in the city also makes it easier to prepare the vehicle before a long journey. A driver heading toward İstanbul or into Anatolia can combine a mall visit with a pre-trip charging stop and use their time more efficiently.
From installation to first charge
Following installation, the station was connected to our central monitoring system on July 9, 2026. The first charging session took place on November 9, 2026. Connection to the central monitoring system marks the stage at which the station's status information and operating data become visible remotely.
Commissioning a DC fast charging station aims to integrate the installed hardware safely into the charging network. Establishing the station's communication with the central system is one of the basic steps in this process; the station thus becomes remotely monitorable and manageable like the other points in the network. Verifying that the charging function works as expected before it is opened to users is also an integral part of commissioning.
The first charging session was the on-site culmination of the journey from installation to use. With this first session, in which the station delivered energy to an EV, the charge point at Özdilekpark Kocaeli AVM effectively took its place in the GIO EV charging network. With installation, connection to the central system and the first charge complete, the station moved on to the responsibilities of the operation period.
Operation and remote monitoring
The station's operation, maintenance and 24/7 remote monitoring are carried out by DBE Energy teams. While GIO EV serves as the charging app and charging network used by EV drivers, DBE Energy handles the installation, commissioning, operation and maintenance of the stations behind the scenes. This division of labor ensures that the user experience and field operations are each handled within their own area of expertise.
Remote monitoring allows a charging station's operating status to be tracked continuously. In general practice, such systems make it possible to see from a single center whether the station is online, the usage status of the charge points, session data and the alerts generated by the unit. Detecting a problem early helps plan the intervention quickly and shorten the time the station is out of service.
For stations serving the public, continuity is the foundation of user trust. For a driver planning to charge while shopping, a working station means their plans go smoothly. Continuous monitoring and regular maintenance are the key tools for meeting this expectation. The station's availability therefore depends as much on the monitoring and maintenance organization behind the scenes as on the equipment on site.
Using the station with the GIO EV app
EV drivers can use the station through the GIO EV app. In public charging networks, apps serve as the driver's main interface throughout the process, from finding the station to starting and completing a charging session. This setup makes it easier to think of charging as part of a visit plan.
Efficient use of charge points in shared spaces such as shopping malls also depends on drivers being considerate of one another. Moving the vehicle away from the charge point once charging is complete allows the station to serve the next driver. At a station with 2 charge points, this consideration helps EV owners visiting the mall access charging more easily.
The station at Özdilekpark Kocaeli AVM was the Kartepe, Kocaeli step in our installation and operation work for the GIO EV charging network. At every station, our goal is to offer drivers a reliable charging experience by managing every stage, from installation and commissioning to operation, with the same care.